Immobiltec and System Ceramics once again rely on Archilinea for the design of the new complex dedicated to System Electronics. Pioneers by vocation and hi-tech by strategic choice, with the creation of this new production hub, Archilinea has designed the "home" of tomorrow's electronics. Developed through a BIM approach with full client involvement, the project stands as a prime example of functional design that seamlessly integrates aesthetics and technological innovation.

scroll to explore

Client

Immobiltec S.p.A.
System Ceramics S.p.A.

Typology

Industrial | Office and Production

Location

Fiorano Modenese, Modena, Italy

Services

Preliminary design, final draft design, execution design, construction site management, health and safety coordination (design and execution phases), design coordination.

Year

2019

Technical data

Construction duration: 22 months
Intervention area: 18,700 sqm
Built area: 7,300 sqm
Energy Certification: A3

Team

Luca Bernardoni, Alice Dazzi Galliani, Michele Albano, Silvia Macchioni, Giorgia Merli.

Credits

Architectural Design: Archilinea S.r.l.

Structural Design: Studio Capellari Associati

MEP Electrical Engineering: Pampuri S.r.l.

MEP Mechanical Engineering: Studio Gatti G. L. S.r.l.

Fire Protection Design: Studio Tecnico Luppi

Construction Site Management: Arch. Giuseppe Gervasi

General contractors: Area Prefabbricati S.r.l., Sic-El S.r.l., S.I.C.I. Impianti, Turchi Cesare S.r.l., IMECO S.r.l., Lazzaro S.r.l., Icras S.r.l., Montedil S.r.l., Laminam S.p.a., Resinsystem Itali S.r.l., Teleimpianti S.p.a., Intertecnica S.r.l.

Image & Photography Credits: Andrea Martiradonna

PROJECT

The new System Electronics hub is a cutting-edge industrial building, providing a unique environment for high-tech quality control facilities. The structure is built with precast concrete elements and features a microshed roof supported by a metal frame with sandwich and polycarbonate panels.

The façade is defined by ceramic portals and “royal blue” glass, housing three levels of offices arranged in a horseshoe layout. Glazed walls enhance natural light and foster interaction between spaces, reflecting a collaborative paradigm. The entrance leads into a triple-height hall featuring a panoramic elevator, while the ground floor hosts technical spaces specifically engineered for a clean and controlled working environment.